arrow-left-paginationarrow-leftarrow-right-paginationarrow-rightarrow-submitbuschevron-leftchevron-rightchevron-small-leftchevron-right-smallchevronclosedrivingexit-fullscreenfacebookfullscreengoogleplusinstagramlogo-altcarmap-trainpinterestplaynational-railtransittubetwitterwalkingyoutube

Building 2

Building 2 is an exceptional new headquarters office offering 65,000 sq ft of Grade A space. It’s located at the heart of Croxley Park, a well-connected hub, relaxing haven and thriving business community.

Download Brochure

Schedule of areas

AreaAvailabilitysq ftsq m
Floor 2Let to Corona20,7121,924
Floor 1Available20,7121,924
Floor GLet to Glenmark PLC20,7121,924
Atrium1,541143
Reception2,002186
Total65,6796,101

Outline spec

Construction

  • Entrance doors feature a 2.8m tall revolving door with a glass top and two pass doors on each side for disabled access.
  • Concrete frame with solid slab.
  • Curtain walling system with glazed metal insulated spandrel panels and gebrik panels. 
  • Windows of polyester powder coated thermally broken frames. The reception glazing is capless and full height.
  • Full height atrium with full height glazing at first and second floors and left open at the ground floor. At roof level the atrium is enclosed with a glass roof.
  • Articulated brick to the circulation stairs.
  • Occupancy density: 1 person per 10 sq m for building services and WCs. 
  • Division module: 1500mm.
  • Designed for fully independent occupation on a floor-by-floor basis with the capacity for further tenant subdivision.

Reception

  • Mat well to all entrances, with architect designed reception desk.  
  • Reception staircase in concrete with circulation cores in steel, with a concrete finish.
  • Specialist feature lighting.
  • Porcelain large format floor tiles with carpet in the seating area.
  • Wall behind reception desk composed of articulated brickslip panels and concealed LED strip lighting.
  • Circulation staircase with exposed strings and spray painted metal.

Lifts

  • 3 x 13 person passenger lifts serving the reception to second floor with group collective controls. 
  • Finish includes illuminated ceiling, stainless steel trims and rails and opaque glass panels and mirror. The floor is tiled to match the reception.

Ceilings and Lighting

  • Office areas feature SAS 330 metal ceilings with square ultra micro perforated lift out tiles with white metal T supports and plaster board margins to external walls. Ceiling height is 2.8m above the raised floor.

Floors

  • Office floors raised with 150mm overall clear, using 600x600 mm fully encapsulated panels on an adjustable steel pedestal system.

Internal Doors

  • Solid hardwood door frames with solid core veneered doors. 

Air Conditioning

  • Comfort Cooled and heated 3 pipe VRV/VRF fan coil air conditioning system. Supply air perimeter zones by continuous perimeter linear slot diffusers and central zones, diffusers in the ceiling.

WCs

  • Floor to ceiling height 2.5m. 
  • Porcelain tiled floor with plasterboard ceilings. 
  • Custom built hand basins/ troughs with composite resin bound concrete material. 
  • White glazed sanitary wear with full height cubicle partitions.

Cycle and Showers

  • On each floor located in the main core:
  • Shower cubicle with fold down bench .
  • Porcelain tiled walls and floor.
  • 50 lockers.

Sustainability

  • BREEAM target of Very Good.
  • EPC target of B.
  • Insulation Value: equal or better than Part L.